Trimble business center hce full#
Read the full story of how Georgiou used the Trimble technology to increase productivity and finish the project early on the Trimble website. Improved productivity with access to accurate, automatic production and volume reports.Ability to monitor where material was removed and dropped.Quickly-defined optimal haul zones using Business Center – HCE.Real-time visibility of cost to move material, load times, and other vital production data.33% project time reduction and 25% hauling productivity gain through transparency of payloads.Georgiou saw benefits in the following areas Georgiou used Business Center – Heavy Construction Edition (HCE) software for Mass Haul Analysis and Design Creation. Data from this hardware was used by InsightHQ and VisionLink® software to improve productivity, increase data transparency and accuracy, and therefore reduce costs. On this project, the team adopted a range of Trimble® solutions including: the 3D GCS900 Grade Control System, 2D Project Monitoring on Haul assets and LOADRITE X2350 excavator scales. They had no access to real-time data on productivity and material movement leading to potentially inaccurate and sometimes delayed information. In the past, Georgiou manually collected payload data to map to cost centres. Trimble Business Center User Guide 1 C HAPTER 1 Welcome To Trimble Business Center Trimble Business Center office software is ideal for processing and analyzing GNSS and terrestrial (total station and level) survey data recorded in the field, and exporting it to a design package. To get a better understanding of payloads, movement of material, and the productivity of operators and mass haul routes, Georgiou turned to SITECH WA.

The site measured 2 kilometers long by approximately 600 meters wide. The six-month project in Alkimos, Western Australia, involved moving 600,000 cubic meters of sand, rock and limestone 1.5 kilometers between the cut and fill zones. When Georgiu Group, a national building construction, engineering and property development company, were awarded a land development project, they took this opportunity to review their productivity and cost control.